Airport Door Project
12m×7m (W×H)
Key challenges:
- Interface issues: The Airport Door Project’s main door is a rigid door body, while the hangar is a tarpaulin. The interface between them is a technical difficulty.

Solution
The Airport Door Project designed a special interface structure to ensure seamless connection between the door body and the tarpaulin.