General Electric Company Project

14m×18m (W×H)

Key Challenges:

  • Site Adaptability: The factory building design did not account for the installation of PVC overhead stacking doors, requiring modified design and installation according to on-site conditions.
hangar door project 4

Solution

Adjust the design scheme flexibly to adapt to the site environment and ensure smooth door installation.