x
Send Your Inquiry Today
Quick Quote

Petroleum Engineering Project

15m×15.8m (W×H)

Key Challenges:

  •  Dimensional Deviation: Owing to the reclamation project at the construction site, the dimensions of the factory building’s door openings do not match the theoretical specifications.

     

hangar door project 8

Solution

Undertake on-site measurements and implement a tailored design to align with the actual dimensions of the door openings.

Scroll to Top